Two FCC actions ease the way for satellites that connect straight to phones. Lynk Global now needs cellular carriers' consent across a much smaller zone before testing in their bands, and SpaceX may buy unbuilt airwaves that would ordinarily have gone back to the FCC for reauction. Separately, the Space Force has set a fiscal 2031 target to disable unauthorized air vehicles over its launch ranges, without citing legal authority for that step.
Archived reporting from October 23, 2026. Dates and statements reflect that edition.
SIGNAL / 1
FCC Shrinks Lynk's Cellular Consent Zone to 100 Km From 316 Miles
The FCC has shrunk the zone where Lynk Global needs cellular licensees' consent before it tests in their bands, from 316 miles around its test area to 100 km. The change comes in a reissued experimental license, the FCC permit that covers a program of testing. The license says it supersedes the earlier version "to amend special conditions 8 and 21."
Condition 8 is the consent rule. Before operating in the 824-849 MHz and 869-894 MHz cellular bands, Lynk must get consent from the cellular licensees within the zone. Cutting that zone to 100 km is a much smaller veto map: fewer carriers get a say, and Lynk has a shorter list to ask before its direct-to-device tests, satellites linking straight to user devices.
Condition 21 cures a contradiction. The version being replaced barred Lynk from 617-960 MHz in the United States, while condition 8 told it how to get consent to operate in the 824-849 and 869-894 MHz bands, inside that range. The reissue expressly authorizes the two cellular bands and keeps the bar on the rest of 617-960 MHz. The license runs until March 1, 2028.
FCC Lets SpaceX Buy Unbuilt Licenses That Would Ordinarily Go Back to Auction
The FCC has approved SpaceX's purchase of three AWS-3 licenses, a block of mobile airwaves at 1695-1710 MHz used only for uplink, from Tristar License Group. The Wireless Telecommunications Bureau adopted and released the order, DA 26-1129, on October 21, 2026. The licenses cover three Economic Areas: 62 counties in eight states and about 4% of the U.S. population. SpaceX plans to use them for its direct-to-device network, satellites that connect straight to phones. SpaceX's direct-to-device plans were last in this briefing on October 9, 2026.
Tristar never built the licenses, and the applicants say circumstances beyond its control kept it from meeting the renewal standard. The order says the FCC's rules "ordinarily foreclose a renewal expectancy for unbuilt licenses," which would instead "revert to FCC inventory for reauction." Here the Bureau waived the renewal standard, granted a temporary and partial waiver of the rule that ends licenses when service is permanently discontinued, and waived the terrestrial (ground-based) construction requirement.
The order calls these "unique circumstances," but its construction waiver rests on the reasoning of the May 12, 2026 SpaceX-EchoStar order. Holders of other unbuilt licenses now have a template to point to: sell to a satellite operator rather than lose the spectrum. In place of ground-based construction duties, SpaceX must meet satellite performance targets for uplink throughput two, four and nine years from November 30, 2027. No petitions to deny were filed. Petitions for reconsideration may be filed within 30 days of adoption.
Space Force Lists Disabling Air Vehicles Among Its Spaceport Requirements
The Space Force has set a target date for controlling the sky above its launch sites, and the control it describes includes disabling unauthorized air vehicles. Space Systems Command reported on October 20, 2026 that the Space Access portfolio office published a vision and requirements document for national spaceport infrastructure. Colonel Eric Zarybnisky signs it as acting Portfolio Acquisition Executive, the official who runs buying for the Space Access portfolio. Think of it as the program office's to-do list, with dates. This first volume in a planned series covers the Eastern and Western Ranges, which the document calls the foundation of the nation's assured access to space.
The airspace requirement carries a fiscal year 2031 target. It calls for maintaining and enhancing Space Force control of the airspace above the spaceport, "including detection, identification, and disablement of air vehicles." The narrative section aims that at "unauthorized aerial vehicles." Detecting and identifying are watching. Disabling is acting. The document cites no legal authority for that last step. Which authority the Space Force would rely on is the open question for anyone who flies near a range without permission.
The rest reads like an airport authority's business plan. Each spaceport will support up to three major operations at once. The document projects a 10% to 25% drop in average operations and maintenance cost per operation. It wants new customers onboarded within six months of program introduction by fiscal 2031. Charges to range customers are to be fully auditable and transparent by fiscal 2029. To pay for upgrades, it says the Space Force must work to reform statutory, regulatory and department policy limits. It names financial techniques used by airports and seaports, and floats making spaceport revenue "timeless" and "colorless" from an execution standpoint. In plain terms, that means range money not boxed in by the usual budget rules on timing and purpose. Customers promised auditable bills will ask what any airport tenant asks first: auditable by whom, and with what recourse when a charge looks wrong?
Essential cookies support accounts, security, and checkout. You can allow optional cookies for analytics, personalization, and advertising, or continue with essential cookies only. Read our privacy policy.