Space law is mostly a fight over who gets protected, and this week it went public. On September 23, 2026 the FCC refused to throw out 16 SpaceX gateway applications as incomplete. The same day, Amazon Leo told the agency that Iridium's band protections deserve a hard look, and SpaceX wants geostationary operators made secondary in part of the Ku-band. Iridium and SES pushed back, all before the FCC's September 30, 2026 vote. Protection lapsed in quieter places too: an ITAR exception for Russia space cooperation went missing for days, and a single-response propellant contract may sit outside DoD's one-bid safeguard.
Archived reporting from September 25, 2026. Dates and statements reflect that edition.
SIGNAL / 1
FCC Keeps Iridium's SpaceX Gateway Objections Alive, Just Not at Intake
Iridium wanted SpaceX's gateway applications thrown out before anyone weighed them. The FCC said no. In a public notice dated September 23, 2026, the agency accepted 16 SpaceX Services, Inc. gateway earth station applications for filing (Report No. SES-02898). A gateway earth station is the ground antenna that links a satellite system to networks on the ground. Each SpaceX entry carries the same line: "We decline Iridium's request to dismiss the instant application as facially deficient."
The reasoning splits two questions apart. Per the notice, Iridium's objection goes to whether SpaceX has met its burdens under 47 CFR 25.203(k). That rule requires an earth station applicant in a shared band to show it will not cause unacceptable interference to other authorized satellite networks, or to certify that it follows coordination agreements. Completeness is a separate question, and on completeness the applications pass. The Bureau adds that it makes no determination on whether any of them should be granted or denied.
A petition to dismiss is the cheap weapon: it can knock an application out without anyone weighing interference evidence. That weapon is now off the table for these 16 sites, from the "Swift Water" Gateway in Cle Elum, Washington to the "Salad Bowl" Gateway in Greenfield, California. What remains is a merits fight in which SpaceX carries the showing and Iridium has to make its interference case land. Under 47 U.S.C. § 309(b), no final action can come earlier than 30 days after September 23, 2026. That is a floor with no ceiling. Meanwhile, Iridium's rivals are arguing its record in a bigger forum.
Amazon Leo Turns Iridium's Gateway Petitions Against the Band Rule Iridium Defends
In an ex parte letter dated September 23, 2026, Kuiper Systems LLC, an Amazon subsidiary writing as Amazon Leo, asks the FCC to refuse Iridium's bid to harden the band protections Iridium relies on. An ex parte letter is a party's on-the-record pitch to the agency. It targets the draft Satellite Spectrum Abundance item (FCC-CIRC2609-02) the FCC takes up at its September 30, 2026 meeting.
The fight is over two narrow bands, 19.4-19.6 GHz and 29.1-29.25 GHz. There, a footnote to the FCC's allocation table, NG166, limits non-Federal fixed-satellite use to feeder links for non-geostationary mobile satellite systems. Per the letter, Iridium wants to strip references to "harmful interference" from paragraphs 66 to 70 of the draft and recast existing waivers on a "non-interference" basis. Harmful interference is a term the FCC's rules define. Amazon Leo argues that a lower, undefined threshold would "give incumbents unilateral authority to block compatible operations."
Then the letter turns Iridium's own record against it. It says Iridium has filed more than 50 petitions challenging gateway earth stations without an interference analysis, and that Iridium's feeder links rely on only four U.S. earth station locations. SpaceX, in its own September 23, 2026 letter, puts the count at 116 petitions against its gateways and calls Iridium's requests "anticompetitive." The ask is blunt: the Commission should "squarely ask whether NG166 remains necessary at all."
Iridium answered the same day. It says the SpaceX interference analysis Amazon Leo relies on uses the wrong methodology, and that its own simulations, run on the ITU's recommended method, show significant interference to its gateways. On the wording fight, it says the FCC itself conditioned the prior waivers on a non-interference basis. It calls the "only four" locations claim not accurate, and says its gateways carry safety-of-life and U.S. government traffic. Its sharpest point: there has been no comment period yet to build a record on whether these protections are technically necessary. The September 30, 2026 item is where that record would start.
SpaceX Asks the FCC to Make Geostationary Satellites Secondary in Part of the Ku-Band
SpaceX wants geostationary satellites, the ones that hover over a fixed spot, to lose standing in one slice of the Ku-band. Its ex parte letter dated September 21, 2026 follows a meeting with the FCC's Space Bureau, and a second letter reports meetings with staff for Chairman Carr and Commissioners Trusty and Gomez. It asks the Commission to make geostationary operations secondary to non-geostationary operations in the 12.7-13.25 GHz band, through the same draft item (FCC-CIRC2609-02) up for the September 30, 2026 vote.
Per the letter, the draft already limits ground-based uplinks in the band to individually licensed gateways and feeder links, to protect non-geostationary downlinks. SpaceX's objection is that it would still require those downlinks to accept any interference from geostationary uplinks, including blanket-licensed earth stations in motion, the terminals on planes, ships and vehicles. Primary versus secondary is not a label. Under 47 CFR 2.105(c)(2), a secondary service may not cause harmful interference to primary stations and cannot claim protection from them.
The pattern: settle by rule what would otherwise be fought one interference case at a time. It has allies and an opponent. The Commercial Space Federation now asks the FCC to make the band "the first NGSO-primary Ku-band." SES, a geostationary operator, met Space Bureau staff on September 23, 2026 to oppose what it calls SpaceX's "eleventh-hour request." SES says the draft already protects non-geostationary downlinks by limiting expanded geostationary uplinks to individually licensed earth stations, and in-motion terminals to transmissions at altitude or off shorelines.
State Department's ITAR Correction Puts a Russia Space Carve-Out Back
A State Department rule published September 18, 2026 deleted, by mistake, the ITAR text allowing certain U.S. Government exports to Russia for government space cooperation. ITAR, the International Traffic in Arms Regulations, governs exports of defense articles and defense services. The rule's main business was elsewhere: Ethiopia, Somalia, and adding Saudi Arabia and Peru to the major non-NATO ally list. A correction effective September 23, 2026 says two of its amendatory instructions failed to limit their edits and removed text inadvertently.
The restored text sits in section 126.1, which sets U.S. policy to deny licenses for exports to certain countries. It bars exemption-based transfers to proscribed countries, with exceptions, and two came back: transfers by or for the U.S. Government, including exports "destined for Russia and in support of government space cooperation," and transfers to a U.S. Government department or agency. The second fix restores three conditions on a university exemption for sharing unclassified technical data with full-time foreign employees.
The September 18 rule's own dates line made it effective on publication, so from September 18 until September 23, 2026 the regulations carried neither of the restored exceptions nor the three university conditions. The correction says nothing about transfers made in that window. It cites the underlying rule as 91 FR 59059 but its instructions as 90 FR 59061. It says it reinserts section 125.4(b)(1)(i) through (iii), while the text it prints revises (b)(10). A correction for faulty instructions, with two citation slips in it.
DLA Buys Hypergolic Propellants From Gaylord Chemical After a One-Response Competition
One company answered the Pentagon's call for rocket propellant. Defense Logistics Agency Energy has awarded Gaylord Chemical Co. LLC of Covington, Louisiana an estimated $46,633,330 commercial firm-fixed-price requirements contract. It covers the manufacture, purification, blending, analysis, packaging and supply of specification-grade hypergolic propellants, fuels and oxidizers that ignite on contact. The September 23, 2026 announcement states plainly: "This was a competitive acquisition with one response received."
The customer list is the stakes: Air Force, Space Force, Navy, War Department, Missile Defense Agency and federal civilian agencies. The term is long: a four-year 11-month base, one five-year option and one six-month extension, with performance in Alabama and a September 14, 2031 performance completion date. A requirements contract means those customers fill their needs for the item from this contract during its term.
DoD has a rule for exactly this situation. Under DFARS 215.371-2, when a competition open fewer than 30 days draws only one offer, the contracting officer must consult on revising the requirement and resolicit for at least 30 more days. But DFARS 215.371-4(a)(7) exempts acquisitions of commercial products and services using FAR Part 12 procedures, and this award is labeled commercial. The exemption does not remove the duty to seek maximum practicable competition and a fair and reasonable price. The announcement does not say how long the solicitation was open, why no one else responded, or which procedures DLA used. One response for propellant serving this many space and missile customers reads less like a pricing story than a supplier-base one.
Essential cookies support accounts, security, and checkout. You can allow optional cookies for analytics, personalization, and advertising, or continue with essential cookies only. Read our privacy policy.